Newfield Storage – Newfield, NY

November 5, 2025

Phase 2 Complete: Expanding with 6,700 Sq. Ft. of Single-Story, Non-Climate Drive-Up Storage

We’re excited to announce the successful completion of Phase 2 of this multi-stage storage development. This phase adds 6,700 sq. ft. of single-story, non-climate-controlled drive-up units, designed and engineered to match New York’s rigorous snow load requirements.

Built for durability, convenience, and long-term performance, these new drive-up units provide effortless accessibility for tenants and dependable structural integrity in even the harshest winter conditions. Every building in this phase was constructed with the same attention to detail and quality that defines our work—ensuring a seamless expansion to the existing facility.

With Phase 2 now complete, the site is better equipped to meet growing demand while maintaining a consistent, professional aesthetic across the property. We’re proud to support our client’s vision as this project continues to take shape, and we look forward to the progress ahead in future phases.

Another phase delivered. More value built.